Connecting the device in a manner inconsistent with manual may cause risk to health, life or material damage.
When connecting the device act in accordance with the following rules:
- Connect only in accordance with one of the diagrams,
- The Switch 2 should be installed in a wall switch box compliant with a relevant national safety standards and with depth no less than 60mm,
- Electrical switches used in installation should be compliant with the relevant safety standards,
- Length of wires used to connect the control switch should not exceed 10m.
Notes for the diagrams:
S1 – terminal for 1st switch (has the function of activating the learning mode)
S2 – terminal for 2nd switch
L – terminal for live lead
Q/Q1 – output terminal of the 1st channel
Q2 – output terminal of the 2nd channel (only Double Switch 2)
N – terminal for neutral lead
B – service button (used to add/remove the device and navigate the menu)
Installation of the device:
- Switch off the mains voltage (disable the fuse).
- Open the wall switch box.
- Connect with one of the diagrams below for appropriate device.
- After verifying correctness of the connection switch on the mains voltage.
- Add the device to the Z-Wave network.
- Turn off the mains voltage, then arrange the device and its antenna in a wall switch box.
- Close the wall switch box and turn on the mains voltage.
Switch connected to the S1 terminal is a master switch. It activates the basic functionality of the device (turning the first load on/off) and activates the learning mode (adding/removing). The switch connected to the S2 terminal turns on/of the second load in Double Switch 2, but is optional in Single Switch 2 and pushing it will not affect the status of the device.
After switching on the mains voltage LED indicator will signal Z-Wave network inclusion state with a colour:
GREEN - device added
RED - device not added
Wiring diagrams:
Wiring diagrams – Single Switch 2
Wiring diagrams – Double Switch 2